CN EN
Product quality

(1) Our company has a strict product quality assurance system, each process has a full-time quality inspectors, process supervisors to follow up, there are well-equipped quality testing centre for product quality to carry out comprehensive follow-up on the quality of each batch of factory products according to the test data issued by the quality assurance certificate.

(2) If there is a quality problem in the supply process, please notify us in writing, we will send a quality inspector to the scene in the shortest possible time to deal with the problem, and we will replace it at the first time.

Lead time

(1) Our company has an annual production capacity of more than 30,000 tonnes, which will surely meet the supply needs of your order.

(2) Specific production lead time for each species (from the date of receipt of the order)

variety Production cycle
Anodic oxidation 12 days
Electrophoretic 12 days
Powder Coating 12 days
Heat-insulating profiles 15 days
Product Packaging

In order to ensure that qualified products are not damaged by mutual friction in the process of transport, our products are useful for single protection and a variety of forms of packaging protection, and each tie is affixed with a standard certificate of conformity marking.

After-sales service

(1) If our company becomes your company's partner, we will assign someone to track and assist our product delivery and quality, problems can be communicated in a timely manner to contact and deal with.

(2) Your company in the construction process, such as the emergence of some technical problems, our company will be ready to send professional and technical personnel to the scene to deal with the solution.

(3) In the process of co-operation, no matter which side of the problem, our company will give all-round technical support, and at the same time, through the co-operation of both sides to continuously improve the level of service of our company.